Home Page Headline News Online Magazines Decision Centers The Full Story Product Watch Truck Statistics
TIRES & WHEELS
TRUCKS FOR LARGE FLEETS
MEDIUM DUTY TRUCKS
TRUCKS FOR SMALL FLEETS
LUBES, FILTERS, AND FUELS
ENGINES & DRIVETRAINS
BRAKING SYSTEMS
FUEL ISSUES
LABOR ISSUES
ENGINE EMISSIONS
BUSINESS ENVIRONMENT
HOURS OF SERVICE
CROSS-BORDER TRUCKING
SIGN-UP HERE
NewsFIRST
Lockwood's Product Watch
NewsFIRST: Mid-week Report
View the Newsletter Archive.
Hybrid Vehicle Technologies Symposium
(Feb 10 -Feb 11)
Future of Trucking Symposium
(Feb 17 -Feb 19)
CAIE's Western Canada conference
(Feb 22 -Feb 23)
See more details and events

e-mail this article print this article
News > Headline News > 04/08/2009
Highway closure could sink Manitoba truckers
04/08/2009
What's your opinion of private international bridges?
Border crossings of importance should be in public hands
Who cares who owns them as long as they're cost-effective and well-managed
view results

WINNIPEG -- Rising flood waters in Manitoba closed a major highway in the province and navigating the detour route will cost the trucking industry millions of dollars.

According to a story in the Winnipeg Free Press, the entire stretch of Highway 75 from Winnipeg to Highway 14 was closed yesterday, and could stay that way for more than two weeks.

The alternate route in effect will be to use Highways 3 to Winkler, then east on Highway 14, before joining up with Highway 75 south. All closures are signed and marked and detour signs are in place to direct traffic.

The Manitoba Trucking Association estimates that carriers relying on Highway 75 to transport goods back and forth across the Canada/U.S. border will add an extra $1.5 million per week in costs.

Bob Dolyniuk, general manager of the MTA, told the local media that the 100 km detour would add $400 for each roundtrip. That could put the cost to the trucking industry at more than $3.5 million -- something that Dolyniuk said it cannot -- and will not -- absorb.

"We’ve already had indications from some of the larger responsible shippers that they recognize there’s an increased cost (because of the detour) and they recognize that trucking companies will have to be paid extra for these costs," he said.

Truckers can’t use Highway 59 as an alternative because of spring weight restrictions on that road between St. Malo and the U.S. border.

In 2006, flooding caused Highway 75 to be closed for 18 days during April.

Earlier this year, a fire to a bridge in B.C.’s Lower Mainland closed the structure for about a week causing significant strain on the region’s travel times. The B.C. Trucking Association at the time said the closure would cost the local trucking industry millions of dollars in lost time and wasted fuel.
 

Related Stories:

- NB flood decimates roads; 'millions' in damage
- Burned out B.C. bridge back in service
- Sunk Truck? ArvinMeritor has some helpful tips

Comment on this article in the (box) below, or to send feedback privately to the editor, click here 
 
Posting your comments requires an account. Please login below:

Log-in here
E-mail:
Password:   
Forgot your password?
Y2C?

Every decade or so, the 'consensus' experts seem to drum up a new apocalyptic disaster scenario to s...more


PACCAR MX ENGINE
After 50 million test miles, the MX is coming this summer ...more
 
HYDRAULIC BRAKE ROTORS
ArvinMeritor Aftermarket adds hydraulic rotors for medium-duty vehicles ...more
 
AIR CLEANER
Donaldson offers PowerCore side-access air cleaner assembly in PSD family ...more
 
2006 VOLVO VNL670
n/a (2) 2006 VOLVO VNL670 HIGHWAY TRACTORS, 61" HI-RISE SLEEPER, CUMMINS ENG; ISX, 450 HP, 12 SPEED AUTO-SHIFT TRANS; 12 & 40 AXLE(S), AIR-RIDE SUSP; 215"....more

Newsletter Signup | About Us | Contact Us | Advertising | Privacy Policy